Now is not the time for anyone to announce that their city will become “bigger and better”. Cities don’t have to get bigger to evolve, and sooner or later all will have to reckon with the concept of degrowth.
Australia must become less reliant on imports of skilled workers, students, tourists and materials. We can make better use of local resources and produce much more of what we need here.
Australian cities have very good bones. They have amazing cultural scenes. Their biomedical capabilities are among the world’s best. Our education sector remains eminently exportable online and via existing overseas campuses. The manufacturing sector still has a base to build on and provide many more of the products Australians need. And our renewable energy capacity is unlimited.
We can support our local hospitality and cultural venues better, and increase intercity and interstate patronage. We can invest in research and development and maintain wealth through innovation and production, rather than the eternal consumption of land.
By Kate Shaw
A report soon to be released by architects at Melbourne University spells out the environmental damage of demolishing the towers — including the thousands of tonnes of concrete sent into landfill and carbon released in producing replacement concrete — and details the benefits of retrofit as a tried and tested alternative. Work from the architectural practice OFFICE on estates in Ascot Vale and Port Melbourne demonstrates that refurbishment and infill can take place without relocating existing residents, at significantly lower social, environmental and economic costs.
The big housing demolition is not only costing the state a great deal; in the short term it massively reduces the affordable housing stock. In the middle of a housing crisis, this is bizarre. Contrary to Keane’s argument that our object is to keep public housing tenants in substandard housing, it is to ensure they remain close to home while more public housing is built. Those towers that can be refitted can be done so with minimal disruption to tenants, who move within the blocks while the work is done. Most public housing estates have expansive grounds. New public housing should be under construction on those estates now, so that when it comes time to demolish the unsalvageable towers, tenants can move into new housing next door. In what way is this a difficult idea?